TB.2.37-Cleaning of flexible reservoirs - ( MSF ).

3.- Technical notes.
TB.2.36-Installation of flexible reservoirs - ( MSF ).
TB.2.35-Emergency water tanks - ( MSF ).
TB.2.34-Water trucking - ( MSF ).
TB.2.33-Pipe installation - ( MSF ).
TB.2.32-Calculation of a simple pipeline - ( MSF ).
TB.2.31-Head losses - ( MSF ).
TB.2.30-Pipes for potable water supply - (MSF ).
TB.2.29-Submersible pump installation - ( MSF ).
TB.2.28-Motor pump kit installation - ( MSF ).
TB.2.27-Determination of the maximum pumping rate of a well - ( MSF ).
TB.2.26-Information required to identify a centrifugal pump - ( MSF ).
TB.2.25-Centrifugal pumps - ( MSF ).
TB.2.24-Basic topographic survey - ( MSF ).
TB.2.23-Controlled bucket chlorination - ( MSF ).
TB.2.22-Monitoring chlorination - ( MSF ).
TB.2.21-Batch chlorination for drinking water - ( MSF ).
TB.2.20-Preparation and use of chlorine solutions for disinfection - ( MSF ).
TB.2.19-Chlorine generating products - ( MSF ).
TB.2.18-Ceramic candle filters - ( MSF ).
TB.2.17-Filtration methods - ( MSF ).
TB.2.16-Assisted batch sedimentation - ( MSF ).
TB.2.15-Jar test for coagulants - ( MSF ).
TB.2.14-Coagulants - Flocculants - ( MSF ).
TB.2.13-Turbidity measurement - ( MSF ).
TB.2.12-Water treatment methods - ( MSF ).
TB.2.11-Water sampling - ( MSF ).
TB.2.10-Water analysis - ( MSF ).
TB.2.09-Rainwater harvesting - ( MSF ).
TB.2.08-Protecting a spring - ( MSF ).