TB.2.07-Jetting - ( MSF ).

3.- Technical notes.
TB.2.06-Fabricating concrete rings - ( MSF ).
TB.2.05-Mortar and concrete preparation - ( MSF ).
TB.2.04-Protecting a shallow well - ( MSF ).
TB.2.03-Cleaning and disinfecting of a well - ( MSF ).
TB.2.02-Description of a hand dug well - ( MSF ).
TB.2.01-Water intakes - ( MSF ).
TB.1.10-Site planning of camps - ( MSF ).
TB.1.09-Essential water and sanitation requirements in camps - ( MSF ).
TB.1.08-Essential water and sanitation requirements for health structures - ( MSF ).
TB.1.07-Basic survey form - ( MSF ).
TB.1.06-Water, Hygiene and Sanitation checklist - ( MSF ).
TB.1.05-Camp checklist - ( MSF ).
TB.1.04-Health structure checklist - ( MSF ).
TB.1.03-Area sampling - ( MSF ).
TB.1.02-Mapping - ( MSF ).
TB.1.01-Data collection methods - ( MSF ).
Technical notes.
MSF - Technical notes.
ICRC - Technical notes
Practical guidelines for test pumping in water wells - ( ICRC ).
https://library.icrc.org/library/docs/DOC/icrc-4033-002.pdf
2011 // 96 pages.
Technical-Review-Borehole-Drilling-And-Rehabilitation-under-field-conditions - ( ICRC ).
https://library.icrc.org/library/docs/DOC/icrc-0998-002-2012.pdf
2012 // 132 pages.
Project & Programme Management - the results-based approach - ( ICRC ).
https://library.icrc.org/library/docs/DOC/icrc-0951-002.pdf
2008 // 89 pages.
Measuring results - ( ICRC ).
https://library.icrc.org/library/docs/DOC/icrc-0995-002.pdf
2009 // 94 pages.
Guidelines for Assessment in Emergencies - ( ICRC ).
https://library.icrc.org/library/docs/DOC/icrc-118000-002.pdf
2008 // 129 pages.